In the section from Rahim Yar Khan to Ghotki, a pair of Cummins C275D5B units will serve two toll stations and lighting, and a third unit will serve the command and control center of Section 07 located at Ghotki. A pair of C700D5 units will serve the service area, which includes a fuel station, mosque, rest area, ATM and food court, with 2 x C220D5 units there on standby. In all, more than 30 unit
NFPA 110 defines “Type” as the maximum time, in seconds, that the emergency power supply system will permit the load terminals of the transfer switch to be without acceptable power Type 10, therefore, has a 10-second time to readiness: meaning that a source of electrical power of required capacity, reliability, and quality must be provided to life safety loads within 10 seconds following loss o
"Watson, tell me about my doctor." "Watson, conduct a survey and record the responses for my nurse." Visiting today’s modern hospitals could make you feel as if you are in a sci-fi movie. Robotic arms in operating rooms, beds with tracking sensors, and cognitive rooms featuring the IBM Watson platform1. In fact, a study from Aruba Networks found that healthcare is the third most adv
UCEM Chimborazo is the second largest cement plant in Ecuador, currently producing around 1.6m tonnes of cement annually. When it came to fail-safe power supply for its new clinker line, Cummins was awarded the bid for this emergency power supply contract. With two existing utilities feeding all loads, a third option capable of managing all critical loads in an emergency situation was req
In rural parts of Oman where there is no connection to the grid, villages rely entirely on the local power station, where Cummins generator sets run 24/7 in continuous operation. During winter, the load on the plant is minimal as there is less cooling required. However, with summer approaching, the load will increase and power requirement will thus be critical. With a need to upgrade the
The sensitivity of loads to the power quality is often of extreme importance and plays a major role in purchasing decisions. While the utility represents a virtually infinite source of power and the impact of site loads is practically negligible, this is not the case when the supply is made from a finite source of power such as a diesel or gas genset. Understanding site loads and transient perf
In Milan, the new 50-story Allianz Tower required cutting-edge design along with protection against power grid blackouts. Cummins Italy was brought in during the build-out to review layout and technical data, specifying the clean and quiet C2250 D5 generator with additional accessories to set the standard. In fact, the Cummins Italy team intricately adjusted the generator placement based on
When Cummins authorized distributor Orient Energy Systems (OES) was approached by a new customer, Ahmad Jamal Textile Mills, the customer came with a requirement of 50 kVA for their home’s power needs and 200 kVA for their manufacturing unit. After meeting with the customer, OES brought in their in-house expert to evaluate the load. The application and project engineer determined that the load in
The e-tailer operates 14 dedicated online stores, selling generators, lawn mowers, water pumps and other outdoor power equipment, shipped directly to the customer. In 2004, PED began offering the Cummins brand to consumers, which includes Cummins Home and Small Business standby generators and Cummins Onan RV and Commercial Mobile generators. In 2018, both Cummins product lines experienced tremendo
Cummins Turkey’s authorized dealer Mepa Energy attended the fair for the first time to meet with new customers and showcase Cummins technology at one of the largest international forums for the manufacturing industry. Held at the Tüyap Fair Convention and Congress Center, Mepa Energy joined thousands of tech and industrial leaders all focused on the future of factories. The event hosted 1,376 e
While weather forecasters are predicting a quieter hurricane season in 2019, homeowners should still take the steps necessary to prepare their home and family for the worst. Alberto, Beryl, Chris, Debby, Ernesto, Florence, Gordon, Helene, Isaac, Joyce, Kirk, Leslie, Michael, Nadine and Oscar. These were the named storms from the 2018 Hurricane Season. After the third consecutive
Cummins Maroc provides sales and service for all Cummins products – engines, generators and components. It is headquartered in Casablanca with multiple branches in Casablanca, Khouribga, Agadir and Tangiers. Two seminars held at the end of February, one in Rabat and the second in Casablanca, highlighted Cummins as a world leader in the design and manufacture of power generation equipment, and i