Cummins Case Studies
We’re in it for the long haul. We build lasting partnerships that lead to smarter innovations for our customers. These customer stories demonstrate our commitment and success in providing customers like you with improved power solutions through world-class innovation in a number of industries.

Filter Case Studies

Agriculture Case Study

Tim and Marney O’Brien own and manage 40,500 hectares (100,000 acres) of irrigated and dryland farm property in the Pilliga and Cryon regions of north-west New South Wales, Australia. In just over 12 months, the O’Briens installed nine Cummins power units as they upgraded and developed the irrigation process for 4,050 hectares (10,000 acres) of their land for cotton farming. In addition, they have

January 20, 2020

Agriculture Case Study

When Canetec (Queensland, Australia) introduced its new Cummins QSL9 powered AX7500 cane harvester, it claimed it would set new standards for operating efficiency. Greensill Farming was Canetec’s first AX7500 customer and we visited them to find out exactly what they thought. Greensill Farming is an agribusiness growing sugar cane, sweet potatoes and water melons in Queensland. The family compa

January 20, 2020

Water Treatment Case Study

Overview Challenge: Provide an emergency standby power system solution that would support the expansion of the water treatment plant in Oman approximately doubling capacity from 57,000 to 125,000 m3/ day for the treatment plant and from 130,000 to 260,000 m3/day for the pumping station using a “single-window system” capability. Cummins Solution:

November 19, 2019

Water Treatment Case Study

Overview Challenge: Ecologically sensitive city required reliable standby power for sewage collection system upgrade to increase safety and reduce the risk of sewage backup. Cummins Solution: Seven Cummins generators ranging from 20 kW to 200 kW, with a sound-attenuated enclosures and compact footprint and transfer switches. Result:

November 18, 2019

Water Treatment Case Study

Overview Challenge: A large regional water treatment plant wanted to ensure that water would continue flowing to more than 200,000 residents even if the electric utility failed. Solution: Cummins provided a complete standby power system solution that included two 2.7 MW diesel generator sets for a total capacity of 5.4 MW as well as transfer sw

November 12, 2019

Healthcare Case Study

Overview Challenge: Design and install an emergency standby power system as part of a major upgrade at AnMed Medical Center in Anderson, SC Solution: Cummins installed three 2000 kW diesel fueled generator sets, transfer switches and digital master control (DMC). Prior to installation, a factory “witness” test was conducted at the Cummins plant

November 11, 2019

Healthcare Case Study

Overview Challenge: Krankenhaus Bozen (KH BZ) Antagen Societa Consortile needed to build a new hospital facility in Bolzano, Italy after an investment request from the local Bolzano medical authority. This required a new emergency power generation system that fit the specific requirements of hospital regulations and met ISO 8528-5 international standards.

November 11, 2019

Water Treatment Case Study

Overview Challenge: A substantial redevelopment project in the town of Wayzata, Minnesota was going to bring hundreds of new apartments, additional office space and a small hotel. All of that required an expanded wastewater system with larger lift stations. One of the larger lift stations would handle wastewater for about half the town. Reliable standby po

November 11, 2019

Healthcare Case Study

Overview Challenge: Design and install new generators, digital controls, paralleling switchgear and transfer switches for life-safety and supplemental power at one of the largest private medical centers in Louisiana Solution: Cummins installed one 1750 kW diesel generator and five 1750 kW lean-burn gas generators equipped with PowerCommand® dig

November 08, 2019

Healthcare Case Study

Overview Challenge: Provide reliable emergency backup power supply for one of Australia’s largest public health infrastructure projects. Solution: Four C3000D5 generator sets powered by Cummins biggest low-emission diesel engine, the 78-litre QSK78G9, with a total a continuous rating of 2.2MW. The fully integrated system also incorporated a sin

November 04, 2019

Marine Case Study

Poland’s impressive history in maritime research will continue to grow with the delivery of two new multipurpose vessels in the second and third quarters of 2020.  Under construction at the noted Remontowa Shipbuiding yard in Gdańsk the two 60 by 12.8-meter vessels will replace two 35-year old vessels working under the direction of the maritime office in Szczecin and Gdynia. The diesel

October 30, 2019

Marine Case Study

There is something special about workboats in the 20-meter range. Their size gives them versatility in the work from towing to pushing and anchor handling to ploughing while have the capability to handle most weather. With good design and adequate power they can run light at over ten knots. The Netherland’s Van Wijngaarden Marine Services BV has such a boat in their fleet and they have outfitte

October 30, 2019

Marine Case Study

The Zhoushan Islands are just off shore of east China's Zhejiang province, and lie south of Shanghai on Hangzhou Bay. The main island is home to a naval base, shipyards and a port. It is a busy island with a well-developed ferry system carrying both people and vehicles back and forth to the mainland. A fine new 690-passenger ferry, Zhoushan Islands Prosperity, has recently been added to this fl

October 30, 2019

Marine Case Study

With a rugged coastline and many fjords to cross Norway has become a world leader in progressive ferry design. Turkey, with a skilled work force and broad marine experience has become a leader in ferry construction. Put the two together and you have the teamwork that results in the Basto series of RO-RO ferries. The latest in the class, Basto VII, to be launched in December of 2019, will be pow

October 30, 2019

Marine Case Study

      When Steve Corkum Jr. of Yarmouth Sea Products couldn’t find a yard prepared to build 15 lobster boats in a single order, he started his own shipyard. Bayview Marine recently launched the first in the 15-boat series and is well pleased with the initial performance.             The 44.3 by 30-foot hull is designe

October 29, 2019

Agriculture Case Study

In 1997, when Equipment Technologies was founded, their mission was to design a tough, reliable, simple sprayer. Their solution was mechanical drive machines that are simple to run and maintain, efficient and light but ultimately, tough enough to get the job done. One of their key product features is the tractor ‘feel’ - a comfortable ride for long days out in the field. The AS640, the lates

September 03, 2019

Rail Engines Case Study

Preserving the natural environment is a responsibility railroads are taking seriously. Although all rail industries are pushing for this, freight has less pressure to push for cleaner, which is why it is extremely noteworthy that Cummins Rail and R.J. Corman Railpower partnered in creating a locomotive that meets Tier 4 Final emission standards.  Cummins Rail Segment stands on the company’s p

July 30, 2019

Marine Case Study

Cummins Vessel Reference #861 Iguazú Jungle is a company providing tourist excursions on Argentina’s Iguazú River. In total, the fleet transports approximately 1,200 passengers daily up through the river’s powerful currents to the foot of the Iguazú Falls in the National Park. The company web page describes the trip from Puerto Macuco, "At its dock, visitors shall board on the boats tha

July 29, 2019

Redirecting to
cummins.com

The information you are looking for is on
cummins.com

We are launching that site for you now.

Thank you.